
Asphalt production equipment, chemical additives and road construction equipment
UAB Sinkai offers asphalt production equipment and spare parts, STEHR soil compaction, stabilization and milling equipment, chemical additives and pigments for asphalt, polyurethane products, filters, sieves, milling teeth, weighing systems, bulk material transportation systems and bitumen emulsion production equipment, polymer-modified bitumen production equipment, paver parts, combined road maintenance machines and more.
Our services include the production of bitumen tanks and silos according to individual needs, modernization of asphalt plants, production of packaging equipment.
We offer new and used asphalt production equipment and asphalt plants. We consult on issues of asphalt plant renovation, assess the condition of used equipment, and help buy or sell used asphalt production equipment.
Asphalt production equipment


Bitumen tanks
Filering equimpent
Polymer-modified bitumen production equipment
Weighing systems
Bitumen emulsion production equipment
Asphalt plants
Paver parts




Chemical additives for asphalt
Chemical additives for asphalt production
Pigments for asphalt
STEHR technique
Combined road maintenance machines
Road construction equipment


Spare parts
Parts for asphalt mixing plants
Filter bags
Milling picks
Polyurethane products
Elevators
Screens


Modernization of asphalt plants
Implementation of a new management system
Automation


We advise on the renovation of the asphalt plant
We assess the condition of asphalt production equipment
We help you sell or buy used asphalt production equipment
Oyher services
STEHR SBV 80 H3 set of hidraulic plates. We have on site! Fast delivery!
Suitable for use with CAT 289D, Bobcat S 650 HF and other compact loaders that have an increased oil flow function. With computer to measure compaction quality.
Width: 2,510 mm
Weight: 1.315 kg
Centrifugal force: 3 x 80 kN
Frequency: 70 Hz
Required oil flow: 80 l/min
Required oil pressure: 200 bar
STEHR sliding frame. Hydraulic cylinder adjustable frame without hydraulic control. Lateral displacement up to 700 mm.
Preparation of slabs for curb compaction. A 3-way valve is provided to bypass 2 slabs, as well as pre-drilled holes for wedges to lift 2 slabs and compact the curb with only 1 slab.

